radiant shield boiler Agent reformer heat recovery system
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
8/5/2020 · The radiant section contains several burners and catalyst-filled reformer tubes suspended vertically in a furnace (Kumar et al., 2017a). The convection section consists of several heat exchangers for waste heat recovery from the combusted flue gas stream. Fig. 1Get Price
plant without hot syngas heat recovery, the use of a heat recovery system can increase the process efficiency by approximately 5 percentage points. High temperature syngas can be cooled using a radiant, a convective, a direct quench cooler or any combinationGet Price
(3) If lost convection section waste heat recovery must be made up via a 90% efficient boiler, the extra fuel requirement would be 16.8 MBtu(LHV)/hr, equivalent to 0.40 MBtu(LHV)/MeTNH 3. (MBtu = million Btu; LHV = lower heating value.) (4) Assumes 90%Get Price
22/6/2011 · The boiler was successfully commissioned in March 2003 and is running continuously now. The existing heater was originally designed as gas fired natural draft in 1968. An air preheating system was added in April 1983. The heat duty of this balanced draftGet Price
8/5/2020 · The radiant section contains several burners and catalyst-filled reformer tubes suspended vertically in a furnace (Kumar et al., 2017a). The convection section consists of several heat exchangers for waste heat recovery from the combusted flue gas stream. Fig. 1Get Price
WASTE HEAT RECOVERY High temperature process gas exit secondary Reformer at 950 deg C is cooled down in Waste Heat Boiler to 360 deg C and in turn high pressure steam (115 Kg/cm2g) is produced. This Saturated Steam produced is super heated to 510 deg C and utilized as driving force for Syn gas turbine which in turn generate Medium Pressure steam.Get Price
31/8/2020 · Heat stress can result in heat stroke, heat exhaustion, heat cramps, or heat rashes. Heat can also increase the risk of injuries in workers as it may result in sweaty palms, fogged-up safety glasses, and dizziness. Burns may also occur as a result of accidental contact with hot surfaces or steam. Workers at risk of heat stress include outdoor Get Price
Each reformer flue gas duct is equipped with the following equipment to recover waste heat: Radiant Shield Boiler (RSB) LT Superheater lIT Superheater Feedstock Preheater Flue Gas Boiler (FGB HP steam is generated at 113.5 kg/sq cmg and the RSB, FGB and RGB's of each reformer share a common steam …Get Price
Each reformer flue gas duct is equipped with the following equipment to recover waste heat: Radiant Shield Boiler (RSB) LT Superheater lIT Superheater Feedstock Preheater Flue Gas Boiler (FGB HP steam is generated at 113.5 kg/sq cmg and the RSB, FGB and RGB's of each reformer …Get Price
Heat recovery from the raw syngas can be by radiation and/or convection heat exchange. As in direct combustion, radiant heat exchange is only used for very high temperature operation. Some gasification processes use a metal liner in the gasifier that recovers heat by generating high- or medium-pressure saturated steam.Get Price
Heat recovery from the raw syngas can be by radiation and/or convection heat exchange. As in direct combustion, radiant heat exchange is only used for very high temperature operation. Some gasification processes use a metal liner in the gasifier that recovers heat by generating high- or medium-pressure saturated steam.Get Price
heat recovery unit 3 46 ۶۸۲ en:Chance seedling 3 12 ۶۸۳ en:Rossington 3 117 ۶۸۴ en:Mixed-use development 3 199 ۶۸۵ Back boiler 1 5 ۱۲۷۰ en:BE-Bridge 1 18 ۱۲۷۱ en:Westaflex 1 17 ۱۲۷۲ en:Weston Otmoor 1 17 ۱۲۷۳ en:Autovent Get Price
Dual-pressure ammonia synthesis loop with a distinctive secondary reformer design, specialized waste heat boiler, radial flow converters. Nowadays, the TKIS dual pressure process can accomplish a production rate of 3.300 mtpd. Fig 10. ThyssenKrupp's dualGet Price
Air Heater or Air Preheaters - An air heater or air preheater is a heat transfer apparatus through which combustion air is passed and heated by a medium of higher temperature, such as the products of combustion, steam or other fluid. Arch - An arch is the flat orGet Price
22/6/2011 · The boiler was successfully commissioned in March 2003 and is running continuously now. The existing heater was originally designed as gas fired natural draft in 1968. An air preheating system was added in April 1983. The heat duty of this balanced draftGet Price
7 RADIANT SHIELD & STARTUP BOILER C Steel 8 PROCESS STEAM SUPERHEATER Cr/ Mo 9 TURBINE STEAM SUPERHEATER Cr/ Mo 10 COMBUSTION AIR PREHEATER Csteel I.D-115mm 11 PRIMARY REFORMER 12 NAPHTHA VAPOURISER Get Price
7 RADIANT SHIELD & STARTUP BOILER C Steel 8 PROCESS STEAM SUPERHEATER Cr/ Mo 9 TURBINE STEAM SUPERHEATER Cr/ Mo 10 COMBUSTION AIR PREHEATER Csteel I.D-115mm 11 PRIMARY REFORMER 12 NAPHTHA VAPOURISER Get Price